TRITON × GO3D

Open the digital twin.

Enter the project code Eddie shared. Scan and model data are loaded only after access is verified.

The link can be shared. The code controls access to client data. Keep both within the authorized project team.

Project use and data

OUTPUT SETTINGS

Prepare CAD / BIM output

Define the result and target area. Every registered full-resolution scan contributes to the calculation. Save the scope here; Project details shows execution status.

Use typed input. This page does not record or transmit audio.

Applies to the selected source cloud.

Your settings stay here.
Set review targets

Review targets

These are requested criteria, not measured accuracy or accepted LOD. Choosing a unit does not scale or convert the scan. STEP/DWG and other outputs remain subject to processing and review.

Project details

Digital twin status

Full scan archives retain all recovered points. The browser uses samples for navigation. Source coordinates alone do not establish alignment.

Available files

Only actual published project outputs are listed. Downloaded client data must remain within the authorized team.

    What is verified?

    • — None acceptedNo current geometry is accepted for survey, fit-up, construction or electrical clearance.
    • △ Check requiredRecovered point records and candidate geometry still need independent review.
    • ? Missing evidenceConfirmed dense-cloud units and datum, verified inter-cloud registration, independent control/checkpoints and required hidden-face evidence.
    • ◇ Conditional scopeCAD/BIM, structural details, terrain and P&IDs depend on an agreed scope and suitable evidence. A surface preview does not establish an accepted solid assembly or BIM element.

    Output settings

    Record the scope for a future processing run. Current scans and surfaces open directly in the scene.

    Processing status

    No live worker status has been verified.

    Handoff instructions

    Use these generic guides only if new source files need preparation. Existing scan data does not need to be uploaded again.

    As-built revisions

    New scans → survey checks → change comparison → accepted revision.

    Open the project to load revision records.

    Survey & metrology requirements

      Shared revision history

        Potential changes stay proposed until the complete dataset and independent ground truth support acceptance. Missing coverage is recorded as not observed. Prior revisions remain intact.

        A simple guide

        Improve this model

        Prepare an offline evidence note. No original files are uploaded by this form. Keep them in their approved location until a reviewer agrees on a secure handoff.

        Received locally → reviewed → proposed change → accepted revision. This note performs only the first stage. It never changes or certifies geometry.